Freezer panels, weighing up to 300 lbs., move down an assembly line where they are framed, filled with injected foam, and then finished.
The problem:
Panels are moved manually with a push cart causing back strains to operators
Lifting the panels through the assembly line required 2 - 6 people depending on the size
Carts caused congestion and took up valuable floor space
Solution: Two side by side GorbelĀ® Free Standing Work Station Cranes with vacuum handling devices - 100 ft. runways and 25 ft. bridges.
Results:
An increase in productivity of 40% and the elimination of overtime hours
Cart paths eliminated and usable floor space gained
Read more about this case study...
Freezer panels, weighing up to 300 lbs., move down an assembly line where they are framed, filled with injected foam, and then finished.
The problem:
Panels are moved manually with a push cart causing back strains to operators
Lifting the panels through the assembly line required 2 - 6 people depending on the size
Carts caused congestion and took up valuable floor space
Solution: Two side by side GorbelĀ® Free Standing Work Station Cranes with vacuum handling devices - 100 ft. runways and 25 ft. bridges.
Results:
An increase in productivity of 40% and the elimination of overtime hours
Cart paths eliminated and usable floor space gained